Air Liquide Austria GmbH
Steel construction + pipe bridge PAT10023
Planning & assembly of a new machine hall as well as multiple pipe bridgesTotal weight: approx. 100 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, PischelsdorfActivity
ProductionProject location
Pirris, Costa Rica, AustriaARGE central Vienna
U4/U3 refurbishment of the Landstraße station
Guidance system elements, insulation, guidance system signage
250 m2 ceiling renovation from compressed resin panels
200 m2 enamel cladding
450 m2 ceiling cladding, aluminium
100 m2 expanded metal cladding
~ 20 to substructures for wall and ceiling
Activity
Planning, Production, AssemblyProject location
Austria, ViennaActivity
Planning, Production, AssemblyProject location
Austria, KapfenbergKanzler Verfahrenstechnik GesmbH
BGT-Tunisia-Steel Structure Concentration Columns
Planning a steel construction plant
Dimensions: L 13.3 m, W 12 m, H 18.5 m
Total weight: approx. 131 to
Material: S235JR, surface painted
Activity
PlanningProject location
TunisiaLafarge Zementwerke GmbH
Conversion and assembly of bucket conveyor
Assembly of a new bucket conveyor works including the required chutes and channels with wear plate cladding.
Production and assembly of chutes and channels (weight approx. 12 tonnes).
Production and assembly of approx. 20 tonnes of steel structures.
The special challenge of this project was the fact that the new bucket conveyor needed to be assembled in very close quarters inside the existing plant and that the channels and chutes needed to be connected with the existing system.
Due to the confined spaces involved, no cranes or electrical lifting equipment were able to be used.
Another criterion was the shut-down period of the existing system and the time to complete the implementation work.
The work was completed in shifts and the production and deliver was "just in time" due to the short shut-down phase.
Activity
Production, AssemblyProject location
Austria, MannersdorfLafarge Zementwerke GmbH
Relocation of HE fans Mannersdorf
Static calculation and planning of a structural steel construction and pipework
Total weight: approx. 150 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, MannersdorfLafarge Zementwerke GmbH - Retznei site
De- und Montage der Elektrofilterkammer 1
Disassembly and reassembly of the electrostatic filter chamber 1
- Disassembly of the existing filter ceiling
- Disassembly of the existing steel construction (catwalks)
- Production and assembly of the new catwalks
- Replacement of the electrostatic filter panels and electrodes
- Installation of the new filter ceiling
Material: S235JR
Steel construction: 10 to
Activity
Production, AssemblyProject location
Austria, RetzneiActivity
ProductionProject location
SlovakiaActivity
Planning, ProductionProject location
Brazil / Rio de Janeiro, Russia / AlchevskSiemens VAI Metals Technologies GmbH
125 to cooling packs
from 3 mm Mo3 sheets 12 m long
65 to steel construction + stairwell for Spain (Bilbao)
Activity
ProductionProject location
AustriaSiemens VAI Metals Technologies GmbH
84 to pipework
for the media package of a ladle furnace incl. underground pipework
23 to system pipework (power station refurbishment)
Delivery and assembly of pipework incl. all requisite engineering and integration works.
8000 lin. m pipework DN 15 to DN 400
Material: C-steel and stainless steel
Activity
Planning, Production, AssemblyProject location
Austria, DonawitzTiger Coatings GmbH & Co KG
Steel construction plant
Static calculation, planning, production and assembly of a new steel construction plant for Tiger Coatings
Dimensions: L 19.1 m, W 14.9 m, H 11.7 m
Total weight: approx. 80 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, WelsTiger Coatings GmbH & Co KG
Cooling system pipework
Order scope:
3D planning of cooling system
Production and assembly of structural steel, total weight approx. 35 t
Production and supply of buffer storage 20m³
Assembly of all necessary equipment
Pipework for the complete system, total approx. 800 linear metres of piping
Pipe dimensions: DN 15 to DN 350
Pipe material: PE HD
Activity
Planning, Production, AssemblyProject location
Österreich, WelsTimac Agro
Top Phos plant
Production of a complete plant based on a customer process diagram with milk containers including agitators, a conveyor screw, fixtures, complete housing (steel construction and insulating panels), and steel tower for emptying sacks (height 6,000 mm).
Complete piping inside the plant and connection piping to the existing plant.
Material:
Container and pipelines 1.4571
Steel construction consisting of coated S235JR
Activity
Planning, Production, AssemblyProject location
Austria, PischelsdorfVA Tech Hydro
5 to material: P265GH, 1.4828
for pressurised pipe ø 2688 mm
Material: S355J2G3, S355JR
Activity
ProductionProject location
Switzerland, Cleuson-Dixencevoestalpine Stahl Donawitz GmbH
Saturated Steam Accumulator Pipework
Dismantling and re-assembly of 3 existing saturated steam accumulators (2 x 80m³, 1 x 55m³), total weight: approx. 120 tons
Duration of the reconfiguration work: max. 6 weeks in shifts
Delivery and installation of the pipework in the main nominal diameter: DN250 – DN350, nominal pressure: PN100
X-ray scope: Saturated steam and process steam lines 100%
Delivery and installation of approx. 55 tons of steel construction and approx. 14 tons of secondary steel construction.
Activity
Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Emergency system 6kV
Production of system piping for an emergency power system
Scope of supply:
- Equipment installation (pumps, tanks, heat exchangers, etc)
- Production and assembly of secondary steel parts (approx. 35 to)
- Pipeline installation
The pipework is largely welded.
Several kilometres of Ermeto pipes also laid.
Pipe dimensions: DN15 to DN1200
Ermeto pipes ø6mm to ø42mm
Media: Steam, exhaust gas, natural gas, feed water, ammoniac,
starting air, compressed air, and I-air, waste and clean water, etc.
Material: 16Mo3, P235GHTC1, 1.4571
Pressure/temperature: up to 40bar and 450°C
Quantity: approx. 8,000 lin. m pipe
Activity
Planning, Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Refurbishment works burdening
- Production and supply incl. assembly of the weighing cradles
- Repair of inspection ways and platforms
- Refurbishment and cladding work (composite armour panels)
for gutters, conveyor belts, vibrators, screens and bunkers
Activity
Planning, Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Disassembly and assembly of steel structure and pipework upstream of the E-hot blast stoves for supplying blast furnace 4
- Disassembly of the existing pipelines and steel structure
- Reinforcement of the existing steel structure
- Installation of the new structural steel platforms
- Production and assembly of the new pipelines
Pipe dimensions: DN1000 - DN2000
Material: S235JR
Quantity: 150 to pipe
Steel construction: 200 to
Activity
Production, AssemblyProject location
Austria, LeobenWaagner Biro Brückenbau AG
Panel bridge
200 to steel construction
Activity
ProductionProject location
EthiopiaWiener Linien GmbH & Co KG
Steel construction works U1 station, Taubstummengasse, "Praterstern" and new construction of the emergency power unit
Lift reinforcement and ascent enclosure, façade panelling and metalwork, steel structure and internal construction works for the lift installation and retrofitting of the fire smoke extraction in the Taubstummengasse underground station
U2/10-Aspernstraße
Reception building and station roofing
250 to steel structures
1700 m2 roof cladding from trapezoidal sheet
20 to lift shaft structures
10 to entrance portal structures