Civic heating systems
Potable water compact stations
Primary compact stations
Gas compact stations
These stations are integrated for central potable water heating, which may also be completed in the necessary kilowatts.
The primary stations are switched intermediately between the primary grid and the building-side secondary grid and also matched individually to the necessary kilowatts.
The gas compact stations are used by industry for supplying plants.
Activity
Planning, Production, AssemblyProject location
Austria, Kesselhäuser in Wien, NÖ, OÖDonau Chemie
Vent stack
Disassembly of old vent top section, production of vent top section ø 1,640 mm, length 18,000 mm
with 2 wind breaker coils along the entire length of the renovated vent segment.
Assembly seam completed at + 42.0 m.
Material: P265GH and 1.4571
Disassembly of old gas pipeline and replacement with new gas pipeline ø 914 mm, length 24,000 mm.
Material: S235JR
Activity
Production, AssemblyProject location
Austria, PischelsdorfActivity
AssemblyProject location
Österreich, LaakirchenSiemens VAI Metals Technologies GmbH
84 to pipework
for the media package of a ladle furnace incl. underground pipework
23 to system pipework (power station refurbishment)
Delivery and assembly of pipework incl. all requisite engineering and integration works.
8000 lin. m pipework DN 15 to DN 400
Material: C-steel and stainless steel
Activity
Planning, Production, AssemblyProject location
Austria, DonawitzTiger Coatings GmbH & Co KG
Cooling system pipework
Order scope:
3D planning of cooling system
Production and assembly of structural steel, total weight approx. 35 t
Production and supply of buffer storage 20m³
Assembly of all necessary equipment
Pipework for the complete system, total approx. 800 linear metres of piping
Pipe dimensions: DN 15 to DN 350
Pipe material: PE HD
Activity
Planning, Production, AssemblyProject location
Österreich, WelsTimac Agro
Top Phos plant
Production of a complete plant based on a customer process diagram with milk containers including agitators, a conveyor screw, fixtures, complete housing (steel construction and insulating panels), and steel tower for emptying sacks (height 6,000 mm).
Complete piping inside the plant and connection piping to the existing plant.
Material:
Container and pipelines 1.4571
Steel construction consisting of coated S235JR
Activity
Planning, Production, AssemblyProject location
Austria, Pischelsdorfvoestalpine Stahl Donawitz GmbH
Saturated Steam Accumulator Pipework
Dismantling and re-assembly of 3 existing saturated steam accumulators (2 x 80m³, 1 x 55m³), total weight: approx. 120 tons
Duration of the reconfiguration work: max. 6 weeks in shifts
Delivery and installation of the pipework in the main nominal diameter: DN250 – DN350, nominal pressure: PN100
X-ray scope: Saturated steam and process steam lines 100%
Delivery and installation of approx. 55 tons of steel construction and approx. 14 tons of secondary steel construction.
Activity
Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Emergency system 6kV
Production of system piping for an emergency power system
Scope of supply:
- Equipment installation (pumps, tanks, heat exchangers, etc)
- Production and assembly of secondary steel parts (approx. 35 to)
- Pipeline installation
The pipework is largely welded.
Several kilometres of Ermeto pipes also laid.
Pipe dimensions: DN15 to DN1200
Ermeto pipes ø6mm to ø42mm
Media: Steam, exhaust gas, natural gas, feed water, ammoniac,
starting air, compressed air, and I-air, waste and clean water, etc.
Material: 16Mo3, P235GHTC1, 1.4571
Pressure/temperature: up to 40bar and 450°C
Quantity: approx. 8,000 lin. m pipe
Activity
Planning, Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Disassembly and assembly of steel structure and pipework upstream of the E-hot blast stoves for supplying blast furnace 4
- Disassembly of the existing pipelines and steel structure
- Reinforcement of the existing steel structure
- Installation of the new structural steel platforms
- Production and assembly of the new pipelines
Pipe dimensions: DN1000 - DN2000
Material: S235JR
Quantity: 150 to pipe
Steel construction: 200 to