Civic heating systems

Potable water compact stations
Primary compact stations
Gas compact stations

These stations are integrated for central potable water heating, which may also be completed in the necessary kilowatts.
The primary stations are switched intermediately between the primary grid and the building-side secondary grid and also matched individually to the necessary kilowatts.
The gas compact stations are used by industry for supplying plants.

Activity

Planning, Production, Assembly

Project location

Austria, Kesselhäuser in Wien, NÖ, OÖ

Donau Chemie

Vent stack

Disassembly of old vent top section, production of vent top section ø 1,640 mm, length 18,000 mm
with 2 wind breaker coils along the entire length of the renovated vent segment.
Assembly seam completed at + 42.0 m.
Material: P265GH and 1.4571
Disassembly of old gas pipeline and replacement with new gas pipeline ø 914 mm, length 24,000 mm.
Material: S235JR

Activity

Production, Assembly

Project location

Austria, Pischelsdorf

Heinzelpaper Laakirchen Papier AG

Delivery and installation of pipes

Replacement of defective pipe sections

Pipe dimensions: DN 80 to DN 700
Pipe material: 1.4432
Total weight of pipes: approx. 20 t

Activity

Assembly

Project location

Österreich, Laakirchen

Siemens VAI Metals Technologies GmbH

84 to pipework

for the media package of a ladle furnace incl. underground pipework

23 to system pipework (power station refurbishment)

Delivery and assembly of pipework incl. all requisite engineering and integration works.

8000 lin. m pipework DN 15 to DN 400

Material: C-steel and stainless steel

Activity

Planning, Production, Assembly

Project location

Austria, Donawitz

Tiger Coatings GmbH & Co KG

Cooling system pipework

Order scope:   
3D planning of cooling system
Production and assembly of structural steel, total weight approx. 35 t
Production and supply of buffer storage 20m³
Assembly of all necessary equipment
Pipework for the complete system, total approx. 800 linear metres of piping

Pipe dimensions: DN 15 to DN 350
Pipe material: PE HD

Activity

Planning, Production, Assembly

Project location

Österreich, Wels

Timac Agro

Top Phos plant

Production of a complete plant based on a customer process diagram with milk containers including agitators, a conveyor screw, fixtures, complete housing (steel construction and insulating panels), and steel tower for emptying sacks (height 6,000 mm).
Complete piping inside the plant and connection piping to the existing plant.

Material:
Container and pipelines 1.4571
Steel construction consisting of coated S235JR

Activity

Planning, Production, Assembly

Project location

Austria, Pischelsdorf

voestalpine Stahl Donawitz GmbH

Saturated Steam Accumulator Pipework

Dismantling and re-assembly of 3 existing saturated steam accumulators (2 x 80m³, 1 x 55m³), total weight: approx. 120 tons
Duration of the reconfiguration work: max. 6 weeks in shifts
Delivery and installation of the pipework in the main nominal diameter: DN250 – DN350, nominal pressure: PN100
X-ray scope: Saturated steam and process steam lines 100%

Delivery and installation of approx. 55 tons of steel construction and approx. 14 tons of secondary steel construction.

Activity

Production, Assembly

Project location

Austria, Leoben

voestalpine Stahl Donawitz GmbH

Emergency system 6kV

Production of system piping for an emergency power system 

Scope of supply:
- Equipment installation (pumps, tanks, heat exchangers, etc)
- Production and assembly of secondary steel parts (approx. 35 to)
- Pipeline installation
  The pipework is largely welded.
  Several kilometres of Ermeto pipes also laid. 

Pipe dimensions: DN15 to DN1200
Ermeto pipes ø6mm to ø42mm
Media: Steam, exhaust gas, natural gas, feed water, ammoniac, 
               starting air, compressed air, and I-air, waste and clean water, etc.
Material: 16Mo3, P235GHTC1, 1.4571
Pressure/temperature: up to 40bar and 450°C
Quantity: approx. 8,000 lin. m pipe    

Activity

Planning, Production, Assembly

Project location

Austria, Leoben

voestalpine Stahl Donawitz GmbH

Disassembly and assembly of steel structure and pipework upstream of the E-hot blast stoves for supplying blast furnace 4

- Disassembly of the existing pipelines and steel structure
- Reinforcement of the existing steel structure
- Installation of the new structural steel platforms
- Production and assembly of the new pipelines

Pipe dimensions: DN1000 - DN2000
Material: S235JR
Quantity: 150 to pipe
Steel construction: 200 to

Activity

Production, Assembly

Project location

Austria, Leoben