ARGE central Vienna
U4/U3 refurbishment of the Landstraße station
Guidance system elements, insulation, guidance system signage
250 m2 ceiling renovation from compressed resin panels
200 m2 enamel cladding
450 m2 ceiling cladding, aluminium
100 m2 expanded metal cladding
~ 20 to substructures for wall and ceiling
Activity
Planning, Production, AssemblyProject location
Austria, ViennaDoubrava GesmbH & Co KG
Vario concrete plant
Static calculation and planning of a Vario concrete plant
Dimensions: L 5.5 m, W 3.2 m, H 18 m
Total weight: approx. 48 to
Material: S235JR, surface hot-dip galvanised
Activity
PlanningProject location
Austria, Attnang PuchheimDoubrava GesmbH & Co KG
Mixing tower REALIT concrete
Static calculation and planning of a new mixing plant in Berndorf
Dimensions: L 10 m, W 7 m, H 12.2m
Total weight: approx. 20 to
Material: S235JR, surface hot-dip galvanised
Activity
PlanningProject location
Austria, BerndorfDoubrava GesmbH & Co KG
Belt conveyor gallery Heraklith St. Egidien
Static calculation and planning of a new belt conveyor gallery in St. Egidien
Total weight: 27.4 to
Material: S235JR, surface hot-dip galvanised
Activity
PlanningProject location
Germany, St. EgidienKanzler Verfahrenstechnik GesmbH
BGT-Tunisia-Steel Structure Concentration Columns
Planning a steel construction plant
Dimensions: L 13.3 m, W 12 m, H 18.5 m
Total weight: approx. 131 to
Material: S235JR, surface painted
Activity
PlanningProject location
TunisiaLafarge Zementwerke GmbH
Relocation of HE fans Mannersdorf
Static calculation and planning of a structural steel construction and pipework
Total weight: approx. 150 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, MannersdorfActivity
Planning, ProductionProject location
Brazil / Rio de Janeiro, Russia / AlchevskSiemens VAI Metals Technologies GmbH
125 to cooling packs
from 3 mm Mo3 sheets 12 m long
65 to steel construction + stairwell for Spain (Bilbao)
Activity
ProductionProject location
AustriaTiger Coatings GmbH & Co KG
Steel construction plant
Static calculation, planning, production and assembly of a new steel construction plant for Tiger Coatings
Dimensions: L 19.1 m, W 14.9 m, H 11.7 m
Total weight: approx. 80 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, WelsTiger Coatings GmbH & Co KG
Cooling system pipework
Order scope:
3D planning of cooling system
Production and assembly of structural steel, total weight approx. 35 t
Production and supply of buffer storage 20m³
Assembly of all necessary equipment
Pipework for the complete system, total approx. 800 linear metres of piping
Pipe dimensions: DN 15 to DN 350
Pipe material: PE HD
Activity
Planning, Production, AssemblyProject location
Österreich, WelsVA Tech Hydro
5 to material: P265GH, 1.4828
for pressurised pipe ø 2688 mm
Material: S355J2G3, S355JR
Activity
ProductionProject location
Switzerland, Cleuson-Dixencevoestalpine Stahl Donawitz GmbH
Emergency system 6kV
Production of system piping for an emergency power system
Scope of supply:
- Equipment installation (pumps, tanks, heat exchangers, etc)
- Production and assembly of secondary steel parts (approx. 35 to)
- Pipeline installation
The pipework is largely welded.
Several kilometres of Ermeto pipes also laid.
Pipe dimensions: DN15 to DN1200
Ermeto pipes ø6mm to ø42mm
Media: Steam, exhaust gas, natural gas, feed water, ammoniac,
starting air, compressed air, and I-air, waste and clean water, etc.
Material: 16Mo3, P235GHTC1, 1.4571
Pressure/temperature: up to 40bar and 450°C
Quantity: approx. 8,000 lin. m pipe
Activity
Planning, Production, AssemblyProject location
Austria, Leobenvoestalpine Stahl Donawitz GmbH
Refurbishment works burdening
- Production and supply incl. assembly of the weighing cradles
- Repair of inspection ways and platforms
- Refurbishment and cladding work (composite armour panels)
for gutters, conveyor belts, vibrators, screens and bunkers
Activity
Planning, Production, AssemblyProject location
Austria, LeobenWaagner Biro Brückenbau AG
Panel bridge
200 to steel construction
Activity
ProductionProject location
EthiopiaWiener Linien GmbH & Co KG
Steel construction works U1 station, Taubstummengasse, "Praterstern" and new construction of the emergency power unit
Lift reinforcement and ascent enclosure, façade panelling and metalwork, steel structure and internal construction works for the lift installation and retrofitting of the fire smoke extraction in the Taubstummengasse underground station
U2/10-Aspernstraße
Reception building and station roofing
250 to steel structures
1700 m2 roof cladding from trapezoidal sheet
20 to lift shaft structures
10 to entrance portal structures