Lafarge Zementwerke GmbH - Retznei site

De- und Montage der Elektrofilterkammer 1

Disassembly and reassembly of the electrostatic filter chamber 1
- Disassembly of the existing filter ceiling
- Disassembly of the existing steel construction (catwalks)
- Production and assembly of the new catwalks
- Replacement of the electrostatic filter panels and electrodes
- Installation of the new filter ceiling

Material: S235JR
Steel construction: 10 to

Activity

Production, Assembly

Project location

Austria, Retznei

Tiger Coatings GmbH & Co KG

Steel construction plant

Static calculation, planning, production and assembly of a new steel construction plant for Tiger Coatings
Dimensions: L 19.1 m, W 14.9 m, H 11.7 m
Total weight: approx. 80 to
Material: S235JR, surface painted

Activity

Planning, Production, Assembly

Project location

Austria, Wels