Agrana Bioethanol GmbH
2 mixing condensers and 1 gas washer
Production of new mixing condensers and gas washer and assembly including changes to the supporting structures
Technical description of mixing condensers:
Ø 2,500 mm, length 8,180 mm
Manholes and installation for condensation separation
Construction material: 1.4571
Technical description of gas washer:
Ø 2,600 mm, length 2,730 mm
Manholes and connection nozzles up to NW900
Construction material: 1.4571 and 1.4301
Activity
Planning, Production, AssemblyProject location
Austria, TullnAgrana Bioethanol GmbH - Pischelsdorf site
Storage tanks for residual molasses
Static calculation, planning, production and assembly of two storage tanks for the residual molasses at Agrana
Dimensions: ∅ 3000 mm, H 5535 mm; material: 1.4301; temperature: chamber 1 50 °C, chamber 2 90 °C; pressure: chamber 1 stat. bar, chamber 2 10 bar; medium: chamber 1 residual molasses, chamber 2 mash with mix. grains; year of manufacture: 2012; volume jacket side chamber 2: 300 litres
Activity
Assembly, Production, PlanningProject location
Austria, PischelsdorfActivity
ProductionProject location
Pirris, Costa Rica, AustriaARGE central Vienna
U4/U3 refurbishment of the Landstraße station
Guidance system elements, insulation, guidance system signage
250 m2 ceiling renovation from compressed resin panels
200 m2 enamel cladding
450 m2 ceiling cladding, aluminium
100 m2 expanded metal cladding
~ 20 to substructures for wall and ceiling
Activity
Planning, Production, AssemblyProject location
Austria, ViennaATG Anlagentechnik GmbH
Steam distributor ∅ 600 mm
Static calculation, planning, production and assembly of a steam distributor at Heiligenkreuz business park
Dimensions: ∅ 600 mm, L 3966 mm
Material: P265GH
Temperature: 220 °C
Pressure: 13 bar
Medium: Steam
Year of manufacture: 2007
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzEnergie Burgenland Biomasse GmbH & Co KG
Product gas cooler 2
Static calculation, planning, production and assembly of a product gas cooler at the Oberwart CHPP
Dimensions: ∅ 912 mm, L 5342.7 mm
Material: chamber 1 P265GH, chamber 2 1.4571/P265GH
Temperature: chamber 1 -10/+300 °C, chamber 2 -10/+900 °C
Pressure: chamber 1 10 bar, chamber 2 0.1 bar
Medium: chamber 1 oil, chamber 2 process gas
Year of manufacture: 2010
Exchange surface: 2500 m2
Volume, jacket-side: 1200 litres
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzEnergie Burgenland Biomasse GmbH & Co KG
Smoke gas cooler 2
Static calculation, planning, production and assembly of a smoke gas cooler at the Oberwart CHPP
Steam heater:
Dimensions: W 940 mm, L 560 mm, H 3750 mm
Material: 1.4571
Temperature: chamber 1 500 °C, chamber 2 700 °C
Pressure: chamber 1 3 bar, chamber 2 0.1 bar
Medium: chamber 1 water/steam, chamber 2 smoke gas
Year of manufacture: 2012
Volume, pipe side: 220 litres
Thermal oil cooler 1:
Dimensions: ∅ 1120 mm, L 5426.5 mm
Material: P265GH
Temperature: chamber 1 250 °C, chamber 2 110 °C
Pressure: chamber 1 -0.1/+0.1 bar, chamber 2 10 bar
Medium: chamber 1 smoke gas, chamber 2 thermal oil
Year of manufacture: 2012
Volume, jacket-side: 1970 litres
Thermal oil cooler 2:
Dimensions: ∅ 1030 mm, L 4858 mm
Material: P265GH
Temperature: chamber 1 250 °C, chamber 2 110 °C
Pressure: chamber 1 -0.1/+0.1 bar, chamber 2 10 bar
Medium: chamber 1 smoke gas, chamber 2 water
Year of manufacture: 2012
Volume, jacket-side: 1550 litres
Air pre-heater 1:
Dimensions: W 1628 mm, L 1336 mm, H 3084 mm
Material: 1.4571
Temperature: 700 °C
Pressure: chamber 1 -0.1/+0.1 bar, chamber 2 0.5 bar
Medium: chamber 1 smoke gas, chamber 2 air
Year of manufacture: 2012
Volume, pipe/jacket-side: 4010/1100 litres
Air pre-heater 2:
Dimensions: W 1328 mm, L 1396 mm, H 4025 mm
Material: 1.4571
Temperature: 700 °C
Pressure: chamber 1 -0.1/+0.1 bar, chamber 2 0.5 bar
Medium: chamber 1 smoke gas, chamber 2 air
Year of manufacture: 2012
Volume, pipe/jacket-side: 4000/5000 litres
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzEnergie Burgenland Biomasse GmbH & Co KG
Product gas cooler 3
Static calculation, planning, production and assembly of a product gas cooler at the Oberwart CHPP
Dimensions: ∅ 508 mm, L 7965 mm
Material: P265GH
Temperature: chamber 1 -10/+250 °C, chamber 2 -10/+400 °C
Pressure: chamber 1 10 bar, chamber 2 0.1 bar
Medium: chamber 1 oil, chamber 2 process gas
Year of manufacture: 2008
Exchange surface: 70 m2
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzEnergie Burgenland Biomasse GmbH & Co KG
Air vessel biomass power station Oberwart
Static calculation, planning, production and assembly of an air vessel at the Oberwart CHPP
Dimensions: ∅ 800 mm, L 2882 mm
Material: P265G
Temperature: 20 °C
Pressure: 10 bar
Medium: Compressed air
Year of manufacture: 2010
Volume: 1 m3
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzActivity
Planning, Production, AssemblyProject location
Austria, EisenstadtEnergie Burgenland Biomasse GmbH & Co KG
Product gas cooler 1
Static calculation, planning, production and assembly of a product gas cooler at the Oberwart CHPP
Dimensions: ∅ 952 mm, L 2763 mm
Material: 1.4571
Temperature: chamber 1 -10/+300 °C, chamber 2 -10/+900 °C
Pressure: chamber 1 10 bar, chamber 2 0.1 bar
Medium: chamber 1 thermal oil, chamber 2 process gas
Year of manufacture: 2010
Exchange surface: 2500 m2
Volume, jacket-side: 350 litres
Activity
Planning, Production, AssemblyProject location
Austria, HeiligenkreuzLafarge Zementwerke GmbH
Relocation of HE fans Mannersdorf
Static calculation and planning of a structural steel construction and pipework
Total weight: approx. 150 to
Material: S235JR, surface painted
Activity
Planning, Production, AssemblyProject location
Austria, MannersdorfActivity
Planning, ProductionProject location
Brazil / Rio de Janeiro, Russia / AlchevskSiemens VAI Metals Technologies GmbH
125 to cooling packs
from 3 mm Mo3 sheets 12 m long
65 to steel construction + stairwell for Spain (Bilbao)
Activity
ProductionProject location
AustriaTiger Coatings GmbH & Co KG
Cooling system pipework
Order scope:
3D planning of cooling system
Production and assembly of structural steel, total weight approx. 35 t
Production and supply of buffer storage 20m³
Assembly of all necessary equipment
Pipework for the complete system, total approx. 800 linear metres of piping
Pipe dimensions: DN 15 to DN 350
Pipe material: PE HD
Activity
Planning, Production, AssemblyProject location
Österreich, WelsTimac Agro
Top Phos plant
Production of a complete plant based on a customer process diagram with milk containers including agitators, a conveyor screw, fixtures, complete housing (steel construction and insulating panels), and steel tower for emptying sacks (height 6,000 mm).
Complete piping inside the plant and connection piping to the existing plant.
Material:
Container and pipelines 1.4571
Steel construction consisting of coated S235JR
Activity
Planning, Production, AssemblyProject location
Austria, PischelsdorfTKV Oberösterreich GmbH
Raw materials cannon
Static calculation, planning, production and assembly of a raw materials cannon at TKV Regau
Dimensions: ∅ 1800 mm, L 4135 mm
Material: 1.4541
Temperature: 158 °C
Pressure: 5 bar
Medium: Meat paste (fluid group 2)
Year of manufacture: 2012
Volume: 7.4 m3
Activity
Planning, Production, AssemblyProject location
Austria, RegauVA Tech Hydro
5 to material: P265GH, 1.4828
for pressurised pipe ø 2688 mm
Material: S355J2G3, S355JR
Activity
ProductionProject location
Switzerland, Cleuson-DixenceWaagner Biro Brückenbau AG
Panel bridge
200 to steel construction
Activity
ProductionProject location
EthiopiaWiener Linien GmbH & Co KG
Steel construction works U1 station, Taubstummengasse, "Praterstern" and new construction of the emergency power unit
Lift reinforcement and ascent enclosure, façade panelling and metalwork, steel structure and internal construction works for the lift installation and retrofitting of the fire smoke extraction in the Taubstummengasse underground station
U2/10-Aspernstraße
Reception building and station roofing
250 to steel structures
1700 m2 roof cladding from trapezoidal sheet
20 to lift shaft structures
10 to entrance portal structures